Highcross Leicester AHU Replacement with DX Coil

Removal of existing LTHW air handling, Replace with high efficiency heat recovery unit with a Dx coil fed from an LG condenser.
All ductwork installed to meet clients requirements and allow access to control panel and insulated and weatherproofed with PIB