Nike Outlet Braintree JCI AHU Replacement

Replacement of Johnson controls heat pump air handling unit at the nike outlet store in Braintree.
This was a like for like replacement in a small compound alterations were carried out to the ductwork and insulated and weatherproofed.

Oadby and Wigston Council offices boiler replacement phases 1 and 2

Removal of UR 300 20 year old boilers and replaced with with new high efficiency condensing Broag Remeha ECO 115 boilers.
Both sets of boilers needed to be replaced this was carried out in 2 stages, all complete with new control panels, Grundfos pumps, Air dirt separators, Dosing pots and pressurisation units.

Highcross Leicester AHU Replacement with DX Coil

Removal of existing LTHW air handling, Replace with high efficiency heat recovery unit with a Dx coil fed from an LG condenser.
All ductwork installed to meet clients requirements and allow access to control panel and insulated and weatherproofed with PIB